1 – Linked hydraulic clamps gluing up first axis 2D curves.
2 – Re-sawn and applying glue for second axis curvature.
3 – Second clamping.
4 – Double curved blanks ready for trimming and fitting.
5 – Full scale trial assembly lateral noggin rails being fitted.
6 – The project team: Gianni, Paolo, Steve, Ziomek, Daniel, Lobis, Michael.